Adding value to the world’s largest zircon mine

ILUKA case study

3D-Dig provided a step change in our mine planning processes. The application allowed us to integrate and optimise our short, medium, and long-term planning from pre-strip to rehabilitation.

— David Addinsall, Former Technical Services Manager, Jacinth-Ambrosia, Iluka

Iluka logo

Iluka is an international mineral sands company with expertise in exploration, development, mining, processing, marketing and rehabilitation. The company has over 60 years’ experience in the mineral sands industry. Iluka’s portfolio includes operations in Australia and Sierra Leone; projects in Australia, Sierra Leone and Sri Lanka; and a globally integrated marketing and distribution network. Iluka is headquartered in Perth, Western Australia.

Adding value to the world’s largest zircon mine

Jacinth-Ambrosia

Iluka’s Jacinth-Ambrosia operation in South Australia is the world’s largest zircon mine. The deposit was discovered by Iluka in 2004 and production commenced in 2009.

Comprising two contiguous deposits, Jacinth and Ambrosia, the mine is located approximately 800 kilometres from Adelaide and 270 kilometres from the Port of Thevenard.

The operation encompasses mining and wet concentration activities with heavy mineral concentrate transported to Iluka’s Narngulu mineral separation plant in Western Australia for final processing.

The main product produced from Jacinth-Ambrosia is zircon, which is used in the manufacture of ceramics as well as in casting and foundry applications. Zircon is also used for the manufacture of zirconium chemicals that have a range of derivative applications, including zirconium metal.

Jacinth-Ambrosia is South Australia’s first mining development in a mixed use regional reserve (the Yellabina Regional Reserve), with the operation recognised consistently by the South Australian Government for its commitment to high standards of environmental management and high levels of indigenous employment.

Overview

Traditionally, backfill planning encompassing both tailings and overburden return at the JacinthAmbrosia mine site relied on an iterative approach using multiple software applications.

While this approach does provide a reasonable result, it is often not fully optimised, the process is time consuming, it can be difficult to integrate between applications and can be challenging to effectively communicate the plan to those executing the works.

When multiple applications are used, common problems encountered include issues linking data, version control, maintaining consistency and data transfer across applications.

An approach was needed that:

  • Encompassed all aspects of earthworks planning including pre-strip, tailings, and rehabilitation
  • Allowed detailed tailings modelling
  • Had the ability to quickly reshape landforms
  • Was able to model earthworks using different mining equipment for optimisation purposes
  • Allowed for fast iteration to run scenarios
  • Provided an output that was easily communicated to all key stakeholders

Streamlined short, medium, and long term mine plan updates

Solution

Using Earth Technology’s 3D-Dig Plus software, Iluka’s Jacinth-Ambrosia mine site is now able to quickly update and optimise the life of mine schedule while considering backfill requirements. Detailed scenario analysis is now an integral part of the site’s regular mine plan updates. 3D-Dig has allowed for the rapid implementation of multiple substantial changes to the life of mine plan at the Jacinth-Ambrosia mine site in response to ever changing market conditions.

In conjunction with updating the life of mine plan, 3D-Dig has been used for other site projects including:

  • Detailed tailings deposition planning for tailings facilities allowing planning for infrastructure (pipes, roads, pumps). Modelling of tailings beaches and decant pond locations leads to less pipe/pump moves and a more efficient overall tailings operation
  • Development of a detailed 5-year mine plan for use in the 2017 mine restart earthworks tender. The mine plan provided visual periodic dig and dump locations allowing tenderers to provide highly competitive rates due to increased understanding of, and confidence in the mine plan
  • Reshaping of final landforms for rehabilitation purposes. 3D-Dig can quickly reshape as-built or designed surfaces to tie in with surrounding topography
  • Detailed short-term planning for interaction between ore and waste, dozer push and truck and excavator movements. The ability to output time series images from 3D-Dig allows for fast comprehension of complex scenarios by those executing the works
  • Life of mine plans in 3D-Dig were used to illustrate to regulators just what the future at JA would look like. This was invaluable when discussing the plans with external stakeholders such as Government bodies

Impact for Iluka

  • Streamlined short, medium, and long term mine plan updates
  • Ability to quickly model tailings deposition and infrastructure plans to reduce rework and increase resource allocation efficiency
  • Increased effectiveness when communicating plans to key stakeholders leading to a greater understanding by all involved
  • Decreased time taken to develop mine plans allowing more focus on optimisation
  • Ability to develop multiple long term mine plan scenarios for analysis in a short time frame increasing the speed of decision making
  • Fast and easy reshaping of final landforms, reducing costs associated with specialised consultants
  • Reduced time spent by site engineers developing complex earthworks plans to allow more time focussed on optimising plans
Using 3D-Dig on site provided a clearer picture of the long-term impact decisions had on the mine plan. This improved our decision-making ability on site and provided greater certainty for the business overall.

— David Addinsall, Former Technical Services Manager, JacinthAmbrosia, Iluka

The life cycle of a tails storage facility has been captured in both PDF and video format and can be accessed below. The example shown is generic in nature to display the capability of 3D-Dig and does represent operations at the Jacinth-Ambrosia mine site.

3D-Dig Tailings Facility Example (PDF)


Over the past twenty-five years, Earth Technology has carried out mathematical and numerical modelling, research and software development in a range of specialist areas. This work has been done in conjunction with a number of other organizations who have acted as funding providers, specifiers, initial users, distributors and/or customers for Earth Technology’s services and products.

3D-Dig is Earth Technology’s Mining Simulation software system. The software is widely used in the Australian open-cut coal mining industry. An ACARP project in 1994 (conducted by ACIRL) initially verified the accuracy of 3D-Dig’s predictions. More recently 3D-Dig has been further developed and successfully marketed in North and South America and in South Africa.