0

3D-Dig Execution and Dumping Course

Master the 3D-Dig Execution and Dumping tool for detailed short-term mine simulation. Learn to create Execution Polygons, build Supersequences, assign excavators, manage dumps and model complex scenar...

Difficulty
Intermediate
  •  
  •  
  •  
Content
3 modules
Price
600 US$
I already have purchase order

Description and Content of 3D-Dig Execution and Dumping Course

Description

Master the 3D-Dig Execution and Dumping tool for detailed short-term mine simulation. Learn to create Execution Polygons, build Supersequences, assign excavators, manage dumps and model complex scenarios including ramp construction and stockpile development.

Objectives

The purpose of this course is to help you master the 3D-Dig Execution and Dumping tool. Working through the lessons of this course, you will:

  • Learn how to create, set up and edit Execution Polygons and construct a Supersequence for the First Lift
  • Assign excavators of different types and set up Preset Productivities for Execution Subsequences
  • Model complex scenarios including ramp construction, ramp removal and multi-lift simulation
  • Create and assign dumps to Subsequences and use Excavation Dependencies to control dump availability
  • Set up image capture and generate simulation text reports in Excel

You can click here to download a detailed PDF of module descriptions.

Certificate

By completing/passing this course, you will attain the certificate 3D-Dig Course Certificate

Content

  • This module introduces basic concepts and settings for 3D-Dig Execution module. You will learn how to create, set up and edit Execution Polygons. And then, construct a Supersequence, based on the Subsequences associated with these Execution Polygons, for the First Lift. Also, you will see how to use Preset Productivity, and assign excavators of different types to Execution Subsequences.

  • In this module, a Simulation for the Second Lift is implemented. The Simulation includes Execution templates for access ramp (down to the second lift) and for the waste for this lift, as well as a particular template to remove the access ramp after the waste is done. A new combo Supersequence for two lifts is assembled and simulated. Some further refinement of the Simulation is applied to fix some issues appeared while the two-lift simulation.

  • This module is focused on creating and assigning dumps for the simulation. Also, a concept of Excavation Dependencies is described. It allows you to avoid prematurely commencing dumping when an appropriate ramp access is not yet complete. Finally, setting up image capturing and reporting are shown.

Still don’t have a 3D-Dig licence?

Know more about capabilities and preferences of our software.

Know more